919997879102 919997879102
Bharat Solar System

Why Solar Energy

Proposed Solution - Large Project Duration six months ( 26 weeks) in three phases. 1st Phase ΓΆ€“ Energy Audit (Due Diligence, Four (4) weeks)
  • During the first phase, due diligence will be done at the Customer facility
  • A proper assessment of the facility (which includes the study of the electrical set up and building layout plan, Capturing of amount of solar incidence during the peak and non-peak hours, ) among the other things will be carried out
  • Based on the information gathered in due diligence following three reports will be submitted. Detailed design report with specification Economics and IRR document with detailed implementation plan 25 years Power Purchasing Agreement (PPA) with Customer and Net metering contract with UP Government The fixed cost of due diligence phase is Rs. 150,000
2nd Phase ΓΆ€“ Implementation phase Purchase Order issued by Customer two(2) weeks 3rd Phase ΓΆ€“ Installation / Implementation, Twenty(20) weeks
  • Contract Signature
  • Solar Panel Layout
  • Connectivity with Existing Electrical System
  • Connectivity with Grid
  • PPA with UP Government
  • Project Closure



Why Solar Energy

Why Solar Energy

Applications of Solar Energy

Applications of Solar Energy